Projects
Project | Client | Date | Length | Diameter | Period |
---|---|---|---|---|---|
Construction of 1.6Km Multi Fuel Line (above ground and below ground) including construction of Pig Loop, Scraper Station, Diesel Manifold. |
BP Australia |
2015 | 1.6Km | 300mm | Construction date achieved |
Construction of a 3.6Km 300mm diameter steel gas main along Donnybrook Road, Kalkallo. For the supply of the Merrifield Donnybrook Road estate. | APA Networks Project Manager Mark Trotto |
2014 | 3.6Km | 300mm | Construction date achieved |
Construction of 3.6Km of MSCL Water Main and 4Km of MSCL Recycled Water Main along Donnybrook Road, Mickleham. | DCE Project Manager Colin Deen |
2014 | 3.6Km, 4.0Km | 300mm, 375mm | Construction date achieved |
502m PE & PVC Water Main and 477m PE & PVC Recycled Water Main along Newbury Boulevard in Highlands Estate. | Stocklands Project Manager Brendan Hall |
2014 | 0.5Km & 0.4Km |
560mm, 450mm, 375mm, 150mm |
Construction date achieved |
Construction of a 4.2Km & a 4.1Km Recycled Water Main in Mt Duneed. With PVC and MSCL pipe ranging from 300mm – 500mm diameter. | Barwon Water Alliance Project Manager Michelle White |
2014 | 4.2Km & 4.1Km | 300mm, 375mm, 400mm, 500mm | Construction date achieved |
2.35km of 200 - 280mm MSCL pipe and 400mm PE pipe along Craigieburn Road | Yarra Valley Water Project Manager Mon Gan |
2013 | 2.35Km | 200mm, 280mm, 400mm | Construction date achieved |
7.1km of 450 NB Class 600 Gas Transmission Pipeline from Dandenong Crib Point to Robinsons Road | APA Group Project Manager Mukesh Bhatia |
2012 | 7.1Km | 450mm | Construction date achieved |
Construction of 8.4km of 500mm Class 600 Gas Transmission Pipeline from Truganina to Plumpton | APA Group Project Manager Richard Cherney |
2012 | 8.4Km | 500mm | Construction date achieved |
Construction of lateral pipeline from Palm Valley to Alice Springs Pipeline (PVP) to a new delivery point at the Pine Gap Power Station with the Joint Defence Facility Pine Gap (JDFPG) | APA Group Project Manager GPA Engineering |
2011 | 6.0Km | 150mm | Construction date achieved |
Construction of Feeder Main at Charlemont Road Armstrong Creek. Comprising of 1,568 metres of 300mm, 75 metres of 300mm, 90 metres of 225mm and 38 metres of 225mm PVC pipeline. | Barwon Water Alliance Project Manager Jill Boag |
2011 | 1.7Km | 300mm, 225mm | Construction date achieved |
Construction of Branch Sewer at Lake Road Connewarre. Three Separable Portions of works in Armstrong Creek development area. | Barwon Water Alliance Project Manager Jill Boag |
2011 | 0.9Km | 375mm | Construction date achieved |
Construction of Rising Main at Lake Road Connewarre. Comprising of 803 metres of 250mm PVC pipeline. | Barwon Water Alliance Project Manager Jill Boag |
2011 | 0.8Km | 250mm | Construction date achieved |
Construction of Feeder Main from Yinnar to Boolarra. Comprising of 8,890 metres of 140mm PE pipeline. | Gippsland Water Project Manager Alex Irvine |
2011 | 8.9Km | 140mm | Construction date achieved |
Construction of Water Main at Boundary Road Grovedale between Ghazepore Road in Waurne Ponds and Charlemont Road in Connewarre. Comprising of 477 metres of 960mm, 2,483 metres of 813mm and 1,605 metres of 648mm MSCL pipeline. | Barwon Water Alliance Project Manager Jill Boag |
2011 | 4.5Km | 960mm, 813mm, 648mm | Construction date achieved |
Construction of 750m of 90mm poly gas pipeline laid along William Street, Wallan. | APA Group Project Manager Dana Damjanac |
2011 | 0.75Km | 90mm | Construction date achieved |
Construction of 5.8Km of 450NB Class 600 natural Gas Pipeline between Thompsons Road and Ballarto Road. | APA Group Project Manager Richard Cherney |
2011 | 5.8Km | 450mm | Construction date achieved |
Construction of 1.2Km of 90mm diameter gas pipeline laid parallel to the Northern Highway, Wallan. | APA GroupProject Manager Dana Damjanac |
2011 | 1.2Km | 90mm | Construction date achieved |
Coating rectification at thirteen locations along the existing Mortlake gas pipeline. Installation of two additional Cathodic Protection points and installation of two temperature probes. | Origin Energy Project Manager Robbie Watt |
2011 | 13 Dig ups | n/a | Construction date achieved |
Construction of 750m of 125mm P7 HP Pipe along Findon Road, Epping. | APA Group Project Manager Dana Damjanac |
2010 | 0.75Km | 125mm | Construction date achieved |
Construction of 400m of 500mm diameter steel gas pipe as an extension at Woodside to the Mortlake pipeline. | Origin Energy Project Manager Paul Henshall |
2010 | 0.4Km | 500mm | Construction date achieved |
Construction of 14km of 1250mm, 1000mm, 900mm MSCL Eppalock to Sandhurst Pipeline Project | Coliban Water Project Manager Nick Derrick |
2010 | 14Km | 1250mm, 1000mm, 900mm | Construction date achieved |
Construction of 2.2km of the 337mm and 419mm MSCL pipeline as part of the Cowies Hill High Level Outlet Main | City West Water Project Manager Mahmoud Al-Madhoun |
2009 | 2.2Km | 337mm, 419mm | Construction date achieved |
Construction of 350m of 1000mm and 24m of 711mm MSCL pipeline as part of the Wimmera Mallee Pipeline Project | Mitchell Water Project Manager Lee Briggs |
2008 | 375m | 1000mm, 711mm | Construction date achieved |
Construction of 2.4km of 1350mm MSCL Distribution Main in St Albans. | Melbourne Water Project Manager Alex Chapman |
2008 | 2.4km | 1350mm | Construction date achieved |
Construction of 1.4km of 660mm MSCL Distribution Main in North Geelong. | Barwon Water Project Manager David Kennedy |
2008 | 1.4km | 660mm | Construction date achieved |
Construction of 600metres of 450mm PVC water main, (also 125mm & 150mm PVC, and 450mm MSCL), in Caroline Springs. | Delfin Lend Lease Project Manager Greg Miller |
2008 | 600m | 450mm | Construction date achieved |
Construction of 80mm/200mm/500mm Steel High Pressure Gas Pipeline – Derrimut | GasNet Project Manager Peter Wheelwright |
2007 | 2.9 kms | 80mm / 200mm / 500 mm | Construction date achieved |