Projects

ProjectClientDateLengthDiameterPeriod
Construction of 1.6Km Multi Fuel Line (above ground and below ground) including construction of Pig Loop, Scraper Station, Diesel Manifold.

BP Australia
Project Manager
Varun Agheda

 2015  1.6Km 300mm Construction date achieved
Construction of a 3.6Km 300mm diameter steel gas main along Donnybrook Road, Kalkallo. For the supply of the Merrifield Donnybrook Road estate. APA Networks
Project Manager
Mark Trotto
 2014  3.6Km 300mm Construction date achieved
Construction of 3.6Km of MSCL Water Main and 4Km of MSCL Recycled Water Main along Donnybrook Road, Mickleham. DCE
Project Manager
Colin Deen
 2014 3.6Km, 4.0Km 300mm, 375mm Construction date achieved
502m PE & PVC Water Main and 477m PE & PVC Recycled Water Main along Newbury Boulevard in Highlands Estate. Stocklands
Project Manager
Brendan Hall
 2014 0.5Km & 0.4Km

560mm, 450mm, 375mm, 150mm

Construction date achieved
Construction of a 4.2Km & a 4.1Km Recycled Water Main in Mt Duneed. With PVC and MSCL pipe ranging from 300mm – 500mm diameter. Barwon Water Alliance
Project Manager
Michelle White
 2014 4.2Km & 4.1Km 300mm, 375mm, 400mm, 500mm Construction date achieved
2.35km of 200 - 280mm MSCL pipe and 400mm PE pipe along Craigieburn Road Yarra Valley Water
Project Manager
Mon Gan
 2013 2.35Km 200mm, 280mm, 400mm Construction date achieved
7.1km of 450 NB Class 600 Gas Transmission Pipeline from Dandenong Crib Point to Robinsons Road APA Group
Project Manager
Mukesh Bhatia
2012 7.1Km 450mm Construction date achieved
Construction of 8.4km of 500mm Class 600 Gas Transmission Pipeline from Truganina to Plumpton       APA Group
Project Manager
Richard Cherney
2012 8.4Km 500mm Construction date achieved
Construction of lateral pipeline from Palm Valley to Alice Springs Pipeline (PVP) to a new delivery point at the Pine Gap Power Station with the Joint Defence Facility Pine Gap (JDFPG) APA Group Project Manager
GPA Engineering
2011 6.0Km 150mm Construction date achieved
Construction of Feeder Main at Charlemont Road Armstrong Creek. Comprising of 1,568 metres of 300mm, 75 metres of 300mm, 90 metres of 225mm and 38 metres of 225mm PVC pipeline.  Barwon Water Alliance
Project Manager
Jill Boag
2011 1.7Km 300mm, 225mm Construction date achieved
Construction of Branch Sewer at Lake Road Connewarre. Three Separable Portions of works in Armstrong Creek development area. Barwon Water Alliance
Project Manager
Jill Boag
2011 0.9Km 375mm Construction date achieved
Construction of Rising Main at Lake Road Connewarre. Comprising of 803 metres of 250mm PVC pipeline.  Barwon Water Alliance
Project Manager
Jill Boag
2011 0.8Km 250mm Construction date achieved
Construction of Feeder Main from Yinnar to Boolarra. Comprising of 8,890 metres of 140mm PE pipeline.  Gippsland Water
Project Manager
Alex Irvine
2011 8.9Km 140mm Construction date achieved
Construction of Water Main at Boundary Road Grovedale between Ghazepore Road in Waurne Ponds and Charlemont Road in Connewarre. Comprising of 477 metres of 960mm, 2,483 metres of 813mm and 1,605 metres of 648mm MSCL pipeline.  Barwon Water Alliance
Project Manager
Jill Boag
2011 4.5Km 960mm, 813mm, 648mm Construction date achieved
Construction of 750m of 90mm poly gas pipeline laid along William Street, Wallan. APA Group
Project Manager

Dana Damjanac 
2011 0.75Km 90mm Construction date achieved
Construction of 5.8Km of 450NB Class 600 natural Gas Pipeline between Thompsons Road and Ballarto Road. APA Group
Project Manager

Richard Cherney
2011 5.8Km 450mm Construction date achieved
Construction of 1.2Km of 90mm diameter gas pipeline laid parallel to the Northern Highway, Wallan. APA GroupProject Manager
Dana Damjanac 
2011 1.2Km 90mm Construction date achieved
Coating rectification at thirteen locations along the existing Mortlake gas pipeline. Installation of two additional Cathodic Protection points and installation of two temperature probes.  Origin Energy
Project Manager
Robbie Watt
2011 13 Dig ups n/a Construction date achieved
Construction of 750m of 125mm P7 HP Pipe along Findon Road, Epping.  APA Group
Project Manager
Dana Damjanac 
2010 0.75Km 125mm Construction date achieved
Construction of 400m of 500mm diameter steel gas pipe as an extension at Woodside to the Mortlake pipeline. Origin Energy
Project Manager
Paul Henshall
2010 0.4Km 500mm Construction date achieved
Construction of 14km of 1250mm, 1000mm, 900mm MSCL Eppalock to Sandhurst Pipeline Project Coliban Water
Project Manager
Nick Derrick
2010 14Km 1250mm, 1000mm, 900mm Construction date achieved
Construction of 2.2km of the 337mm and 419mm MSCL pipeline as part of the Cowies Hill High Level Outlet Main City West Water
Project Manager
Mahmoud Al-Madhoun
2009 2.2Km 337mm, 419mm Construction date achieved
Construction of 350m of 1000mm and 24m of 711mm MSCL pipeline as part of the Wimmera Mallee Pipeline Project Mitchell Water
Project Manager
Lee Briggs
2008 375m 1000mm, 711mm Construction date achieved
Construction of 2.4km of 1350mm MSCL Distribution Main in St Albans. Melbourne Water
Project Manager
Alex Chapman
2008 2.4km 1350mm Construction date achieved
Construction of 1.4km of 660mm MSCL Distribution Main in North Geelong. Barwon Water
Project Manager
David Kennedy
2008 1.4km 660mm Construction date achieved
Construction of 600metres of 450mm PVC water main, (also 125mm & 150mm PVC, and 450mm MSCL), in Caroline Springs. Delfin Lend Lease
Project Manager
Greg Miller
2008 600m 450mm Construction date achieved
Construction of 80mm/200mm/500mm Steel High Pressure Gas Pipeline – Derrimut GasNet
Project Manager
Peter Wheelwright
2007 2.9 kms 80mm / 200mm / 500 mm Construction date achieved